建筑保温板施工现场存贮要求 |
添加时间:2017/5/11 15:56:20 浏览次数: |
将建筑保温材料全部放在施工现场会有利于材料的取用,节省时间。事实上,由于施工现场场地有限,在一定的面积内除了建筑材料之外,还有施工人员和施工工具。现场材料一旦堆放过多,会造成现场使用面积不足,人员活动范围缩小,对施工进度没有任何帮助,反而会影响施工进度和质量。一般不应放置超过三天的材料使用量。 The construction of insulation materials in the construction site will be helpful for the use of materials and save time. In fact, due to the limited construction site, there are also construction personnel and construction tools in addition to building materials in certain areas. Once the scene material piled up too much, will cause the usable floor area is insufficient, range of human activities, the construction progress without any help, it will affect the construction progress and quality. It should not be used for more than three days. 建筑保温板施工现场存贮堆放要求具体如下: The requirements for the storage and storage of building insulation board are as follows: 1.堆放场四周应由不燃类材料围挡; The yard should be surrounded by non-combustible materials. 2.堆放场应为禁火区域,其周围10m范围内及上空不得有明火作业,并应有显著标识; The stacking field shall be in the forbidden zone, and shall not have a bright fire operation within 10 meters of the surrounding area, and shall be clearly marked; 3.堆放场附近不得放置易燃、易爆等危险物品; No inflammable, explosive, and other dangerous goods may be placed near the yard. 4.堆放场应配备种类适宜的灭火器、砂箱或其他灭火器具; The yard should be equipped with a suitable type of fire extinguisher, sandbox or other fire-extinguishing appliance. 5.堆放场地内材料的存放量不应超过3天的工程需用量,并应采用不燃性材料完全覆盖。 The amount of material stored in the yard shall not exceed 3 days of construction and shall be fully covered by non-combustible materials. 6、材料堆放的高度也要有所限制,过高的话重量会增加,底层的材料容易受损,也容易倾斜倒下,对人员安全造成威胁。 6, stacking height is limited, too much weight will increase, at the bottom of the material is easy to damage, and easy to tilt down, and pose a threat to personnel safety. |
上一页 冷库保温材料的保温性能 |
下一页 高层建筑外墙保温注意事项 |
Copyright © 技术支持:遨游网络